Information about the projects included in the public investment program in 2020 is given below
Project Owner |
Project Name |
Location |
Characteristic |
Start-Finish Date |
Total Project Cost (TRY) |
Total Investment End of 2019 (TRY) |
Investment Planned at 2020 (TRY) |
General Directorate of State Railways |
Adana-Osmaniye-Gaziantep High Standard Railway |
Adana, Gaziantep, Kahramanmaraş, Osmaniye |
Line Addition (25,50 km), Control, Consultancy, High Standard Railway (235,50 km) |
2010-2023 |
4.821.618.000 |
2.330.617.000 |
650.000.000 |
Ministry of Transportation and Infrastructure |
Çukurova Region and İskenderun Bay |
Adana, Hatay, Osmaniye |
Electrification, Junction Line (36 km), Control, Consultancy, Signaling |
2020-2023 |
747.908.000 |
- |
128.103.000 |
Ministry of Health |
Osmaniye State Hospital |
Osmaniye |
Capacity of 600 beds, 120.000 m2 |
2015-2023 |
458.673.887 |
- |
63.572.201 |
General Directorate of State Hydraulic Works |
Kadirli Savrun Dam |
Osmaniye |
Storage (93,45 hm3), Irrigation (4.715 ha) |
2016-2025 |
341.990.000 |
- |
3.000.000 |
General Directorate of Highways |
Osmaniye-Nurdağı |
Gaziantep, Osmaniye |
Split Road (52 km) |
2010-2023 |
171.181.000 |
14.822.000 |
10.000 |
İLLER BANKASI A.Ş. |
Osmaniye Sewage, Stormwater and Waste Water Treatment |
Osmaniye |
Waste Water Treatment PLant (1.000 m3/day), Sewage Network (380 km) |
2017-2022 |
96.396.000 |
5.975.000 |
27.949.000 |
İLLER BANKASI A.Ş. |
Osmaniye Drinking Water |
Osmaniye |
Drinking Water Supply (1 adet), Mains (420km) |
2017-2022 |
82.854.000 |
5.112.000 |
24.033.000 |
General Directorate of State Railways |
Osmaniye-Toprakkale-Erzin |
Osmaniye |
Junction Line (6 km) |
2020-2021 |
78.257.000 |
- |
1.000 |
İLLER BANKASI A.Ş. |
Kadirli Sewage Network |
Osmaniye |
Waste Water Treatment PLant (31.992 m3/day) |
2013-2020 |
26.025.000 |
25.361.000 |
664.000 |
OSMANİYE KORKUT ATA UNIVERSITY |
Central Research Laboratuary |
Osmaniye |
Construction (2.524 m²), Machinery-Equipment |
2010-2020 |
12.531.000 |
12.526.000 |
5.000 |
İLLER BANKASI A.Ş. |
Osmaniye Sewage Network |
Osmaniye |
Sewage Network (14 km), Collector (3 km) |
2014-2020 |
12.215.000 |
10.091.000 |
2.124.000 |